Materials

  1. Home
  2. Knowledge Base
  3. Mass Save Guidelines
  4. Mass Save Contractor Qualifications and Responsibilities
  5. Materials

There is a detailed requirement for the materials used as part of the Mass Save program and includes the following:

  • The materials supplied must follow the appropriate specifications. 
  • All materials shall comply with catalog listing. 
  • A written pre-endorsement by a PA is required for any kind of material substitution. 
  • An SDS (Status Determination Statement) is required by each Mass Save Contractor on the job site for every material used.

Was this article helpful?

Related Articles